Kenilworth Rail Station update April 2017

Thursday 11th of May 2017 01:20 PM

Pic 1 – Temporary Works for Installation of Manhole as part of the Severn Trent Water Diversion works.

Pic 2 – Installation of Platform 1 Pile caps, precast concrete beams and Electrical Ducting

Pic 3 – Platform 2 Foundations for lift shaft and bridge stairwell.

Aerial shots of site before and during

In the before picture you will see the site before scheme commenced when it was occupied by Buildbase.

Before

In the after picture this is a recent aerial shot, giving an overall view of all of the work that is currently taking place on the site.

After

Category: Infrastructure