Coventry and Warwickshire has key locations for investors across the area.  For further information about individual sites please get in touch with the team

Location

CV3 4FW

Description

A large Sub Regional Development Site in two parcels based on redevelopment of land around Coventry airport. Part of the site is now earmarked for the UKBIC establishment.  

- Business, General Industrial, Storage or Distribution

The scheme is made up of two seperate plots. The southern 200 acres is capable of providing 3.5 million sq ft of large B2/B8  warehousing, whilst the northern 60 acre plot fronting the A45 has the potential for a variety of B1(a) (b) and (c) uses together with a hotel and other ancillary retail users totalling 900,000sq ft.

Planning status

B1, B2, B8

Total site area

260 acres

Remaining site area

97 acres

Developer

Coventry and Warwickshire Development partnership and Roxhill.

Infrastructure ready

The scale of the site means that it will require substantial new infrastructure both to serve the new development and facilitate the integration of this sub regional site into the southern fringes of Coventry .The scheme will also deliver a new country park .

 

Location

Baginton Fields, Coventry

Description

The site provides an important link to the existing Jaguar Land Rover global headquarters and engineering centre  and to the Coventry and Warwickshire Gateway scheme adjacent but seperated by the A45.

Planning status

B1, B2

Total site area 62 acres
Remaining site area 40 acres

Developer

Coventry City Council

Infrastructure ready

A new link between the Gateway development and the existing Whitely Business park will come forward as part of the development of this area. There will be major improvements to the major road network and to local connectivity including links to the town centre.

 

Location

CV1 2FJ

Description

Prime office location adjacent to railway and transport hub 

- Business, Retail, Leisure, Residential

Friargate will create a new high quality business gateway into the city centre providing over 3 million square feet of mixed use space over 25 efficient and sustainable new buildings - including 14 grade A office bui8ldings, two hotels and new homes, all set within greatly enhanced public realm to improve the linkages between the 37 acre site, Coventry Railway station and the city centre. The development will also create up to 15,000 jobs.

Planning status

B1

Developer

Coventry City Council and partners

Infrastructure ready

The development of the site will bring further improvements to local infrastructure related to the key linkn between the railway station and Coventry Townn Centre.

Location

Tamworth, B78 2EY

Description

Major new logistical park close to J10 M42.Phase1 comprises 3 units ranging from 12,000 sq ft -49,000 sqft 

- Storage or Distribution

The scheme has outline consent for up to 705,000 sq ft of employment uses, with a reserved matters application pending on Phase 1 for 90,0000 sq ft which will be available for occupation in Q4 2018. Built to suit opportunities will be available on Phase 2 for up to 615,000 sq ft.

Planning status

B2 and B8

Total site area 32 acres
Remaining site area 13 acres

Developer

St Modwen

Infrastructure ready

The site will bring forward major improvements to local highway infrastructure.

Location

CV7 9RD

Description

Sub regional industrial site accomodating UK headquarters of Meggit Plc. Based on a Brownfield redevelopment of aero manufacturing plant with a capacity to provide a further 2.3m sq ft of business space, ideal for Advanced Manufacturing

Planning status

B1, B2

Total site area 196 acres
Remaining site area 27 acres

Developer

Manse Opus /Rolls Royce

Infrastructure ready

Further improvements to local infrastructure including a new link between the site and the existing Ansty Business park.

Location

B46 1GA

>

Description

Redevelopment of former power station site close to the existing Hams Hall Business Park and  aimed to accommodate a range of  high quality uses. Available Land 20 Ha.It has recently been announced that a new electric engine manufacturing facility will be located on this site.

Planning status

B2

Developer

Prologis

Infrastructure ready

Further improvements to the infrastructure serving the Hams hall Business Park.

Location

Alcester Road, Stratford, CV37 9EJ

Description

Land adjoining A46 corridor close to Stratford centrewhich aims to providea full range of business uses together with some retail provision on the site frontage. Available Land 23 Ha

- Business, General Industrial

Planning status

B1, B2 and B8

Developer

IM Properties

Infrastructure ready

The scheme will bring forward local improvements to the A46 trunk road and links to the town centre.

Location

Redditch Eastern Gateway, B98 9EU

Description

Major improvents to the highway network including the M42  and new pedestrian and cycle links to Reditch Town Centre  are brought forward by this scheme 

Planning status

B1, B2 and B8

Total site area 78 acres
Remaining site area 19 acres

Developer

Stoford Developments

Infrastructure ready

Major improvents to the highway network including the M42  and new pedestrian and cycle links to Reditch Town Centre  are brought forward by this scheme 

Location

Rugby, CV23 9LP

Description

New sub regional distribution and logistics park known as Symmetry Park which will provide up to 1.9m sq ft of new business space top meet growing business requirements 

Planning status

B8

Developer

DB Symmetry

Infrastructure ready

A wide range of infrastructure will be provided to facilitate this and the adjoining major residential scheme.

Location

CV10 0TU

Description

Major sub regional scale extension to existing automotive research facility.

Planning status

B2

Developer

MIRA

Infrastructure ready

This important sub regional extension to the established automotive research and development centre will require major improvements to adjoining trunk road network based around the A5.

Location

Spa Park, Leamington, CV31 3HH

Description

New Offices and industrial buildings around existing core -premium redeveloped site close to Leamington centre  which can provide units from .

Planning status

B1, B2 and B8

Developer

Stoford Developments

Location

Tournament Fields Warwick, CV34 6LG

Description

This is a  well established light industrail and office park close to Warwick and M40 .Alongsidea wide range of exuisting tenants it can provide units from around 15,000-80,000 sq ft 

- Business, General Industrial, Storage or Distribution

Planning status

B1, B2 and B8

Total site area 9.7 acres
Remaining site area 9.7 acres

Developer

CWC Group

Infrastructure ready

The main infrastructure for the site is already provided to serve the established busines park.

Location

Nuneaton, CV10 7PH

Description

A new major proposal for a business park accommodating a wide range of units aimed at general industrial ,storage and distribution business .The site is close to the M6 and both Nuneaton and Coventry town centres.The first units are expected in 2020.

Planning status

B1, B2 and B8

Total site area 24 acres
Remaining site area 24 acres

Developer

The Arbury Estate

Infrastructure ready

The site will bring forward improvements to the A444 link between Coventry and Nuneaton and to the local network

Location

Eastern Green, Coventry

Description

15ha of employment land adjacent to the A45 (policyJE2, which is to be brought forward in advance of the residential development. The provision of a new Major District Centre. Provision of 1 2FE primary school. New grade seperated junction from the A45 to provide primary site access. Creation of publicly accessile green corridors along the Pickford Brook and its tributaries. Retention of medieval moat at Pond Farm and retention of important hedgerows. Inclusion of appropriate screening to Pickford Green. 

Business, General Industrial, Storage or Distribution

Planning status

B1b and c, B2 and B8

Developer

Hallam Land

Infrastructure ready

The development will require major new highway and other infrastructure improvements. The employment land will share infrastructure with a major new housing development being forward on adjacent land.